Grid Connection & Compliance

Reduce approval risk with robust studies, controls alignment, and submission-ready evidence. We support renewables and BESS teams in moving from analysis to utility-ready documentation with fewer gaps, inconsistencies, and rework.
We support developers, EPCs, and owners with MV/LV connection feasibility, model QA, power quality and harmonics compliance, and inverter controls verification—focused on consistent assumptions, traceable outputs, and utility/NSP-ready documentation.
Modern electrical substation equipment mounted on a concrete platform surrounded by gravel with overhead power lines and bare trees at sunset.
1. Harmonics & Power Quality Compliance
OpenDSS-based harmonic and power quality assessment: harmonic load flow, compliance reporting/evidence packs, mitigation option assessment, and verification support through connection/commissioning.
2. Distribution Connection Advisory (MV/LV)
MV/LV connection feasibility and connection-point assessment, with technical inputs for utility submissions, approval documentation, and commissioning support.
3. Modelling Foundations (MV/LV)
OpenDSS MV/LV studies: power flow, fault level screening, harmonics/power quality, and model QA/benchmarking for planning and compliance packs.
Built on 10+ years
of hands-on grid
engineering.
Smiling construction worker wearing a white hard hat and yellow safety vest at a building site.
MV/LV connection support with traceable study evidence.
We support MV/LV grid connection work from feasibility through utility/NSP submission. We develop and QA OpenDSS models, assess harmonics and power quality, and verify inverter control settings—packaged with clear assumptions and traceable evidence for review and approvals.
Request a Technical Call
01
Planning
Confirm requirements, datasets, and study scope. Define acceptance criteria, reporting format, and model governance (versions, assumptions, QA checks).
02
Execution
Build and QA MV/LV models, run required studies (power flow, fault screening, harmonics/power quality), and iterate control settings where required.
03
Delivery
Provide submission-ready documentation: results, assumptions log, model register, traceability index, and annexes aligned to utility/NSP review needs.